Skip to content
Halloween 2026Explore the community map

Community

Zone 7 Water Agency and City of Pleasanton Open Arroyo Mocho Trail Riparian Overlook and Steelhead Habitat Reach at Bernal Avenue

Restored cobble spawning riffles, a 1,600-square-foot stone trailhead deck, and solar flood-stage telemetry enhance Tri-Valley flood protection and multi-use trail access.

By Tri-Valley Weekly
Published · 2 min read

Cyclists and walkers gathered at a stone-and-timber creekside overlook deck beside a restored cobble stream channel and autumn sycamores along the Arroyo Mocho Trail in Pleasanton
Pleasanton cyclists, walkers, and Zone 7 Water Agency hydrologists gather on the new stone-and-timber overlook deck beside the restored Arroyo Mocho channel near Bernal Avenue.
Your listening Queue & catch up
Unheard stories first, timed at 1×. Your selections stay first.

Add a story or build a catch-up queue to start listening.

Watershed engineers with the Zone 7 Water Agency and trails planners from the City of Pleasanton Community Services Department dedicated a 1,800-linear-foot naturalized stream channel reach, a stone-and-timber riparian overlook plaza, and a repaved multi-use trail segment on Sunday afternoon along the Arroyo Mocho Trail at the Bernal Avenue and West Las Positas Boulevard crossing in central Pleasanton. Originating in the Cedar Mountain hills southeast of Livermore and flowing across the Tri-Valley to the Arroyo de la Laguna, the Arroyo Mocho serves both as a vital groundwater-recharge and flood-control channel and as Pleasanton's busiest east-west bicycle commuter spine.

Within the low-flow channel bed, fluvial geomorphologists replaced eroded trapezoidal dirt banks with stepped boulder-weir riffles, deep gravel percolation basins, and biotechnical willow-wattling root wads. The natural grade-control structures slow winter storm velocities during atmospheric rivers, increase percolation into the Livermore-Amador Valley groundwater basin by an estimated 420 acre-feet annually, and shade cool-water pools for native fish and western pond turtles.

Along the northern top-of-bank trail, contractors widened 2,400 feet of the Arroyo Mocho Trail to twelve feet of smooth asphalt and built a 1,600-square-foot semicircular Sonoma stone overlook deck at the Bernal Avenue bridge. A solar-powered ultrasonic stream-gauge kiosk displays real-time creek flow and aquifer recharge metrics for passing students and cyclists.

The $615,000 flood-channel and trail enhancement was funded jointly by the Zone 7 Water Agency Flood Protection Fund and the City of Pleasanton Trails Master Plan reserve. Interactive Tri-Valley trail maps and groundwater reports are available on the Zone 7 Water Agency Official Website.

About the Venue

Sources

Comments (0)

No comments yet. Be the first to share a thought on this story.

The free newsletter

The Tri-Valley, in your inbox.

The local stories worth knowing, delivered once a week.

From Alamo, Danville, San Ramon, Dublin, Pleasanton, and Livermore.

Get the newsletter

Free to read. Unsubscribe anytime.

More local stories